Internal Control · 2025
In this section9 topics
- Internal Control — Board Opinion1 item
- Adequacy & Appropriateness of the Internal Control System1 item
- Internal Control Deficiencies1 item
- Audit Committee & Auditor Observations3 items
- Opinion on the Head of Internal Audit2 items
- Appointment, Discharge & Transfer of the Head of Internal Audit1 item
- Related Party Transactions1 item
- Counterparties & Transactions3 items
- Policy & Future Trends2 items
Internal Control — Board Opinion
Summary of the Board's Opinion on Internal Control
The Board of Directors at the Company recognizes the importance of having proper internal controls in place for operational efficiency, effectiveness, reliability, and compliance with relevant laws and regulations. To maintain good corporate governance and improve the internal control system, the Company has engaged an external firm specializing in internal audit services. This firm will conduct an internal audit and provide recommendations for establishing, streamlining, and improving the Company's internal control system. As a result of this collaboration, the Company has created an internal audit unit to monitor and design work systems that ensure compliance with the Company's requirements and regulations.
To assess the effectiveness and relevance of the internal control system, the management has engaged the external firm to collaborate with the internal audit unit. The Board of Directors has assigned the Audit Committee to review and evaluate the internal control system and present its findings to the Board of Directors.
Adequacy & Appropriateness of the Internal Control System
Internal Control Framework Used
| Framework | Detail |
|---|---|
| The Committee of Sponsoring Organizations of the Treadway Commission (COSO) | In 2025, the Audit Committee engaged KPMG Phoomchai Business Advisory Ltd. (“KPMG”), an external firm, as the Company's internal auditor. Partner of KPMG, Ms. Naipaporn Sagulyat, will work closely with the Company’s internal audit unit. The findings of the internal audits will be presented directly to the Audit Committee. Moreover, the Audit Committee assigned the Company’s internal audit department to ensure the evaluations of the internal control are conducted in accordance with the regulator’s standards. The Company has adopted an evaluation framework based on the five components outlined by COSO.
|
Internal Control Deficiencies
Number of Deficiencies
| Metric | Current Year | Previous Year | Two Years Ago |
|---|---|---|---|
| Total number of internal control system deficiencies (cases) | 0 | 0 | 0 |
Audit Committee & Auditor Observations
Audit Committee's Opinion Differs from the Board's
Yes
Audit Committee's Differing Opinion
Independent directors serving on the Audit Committee attended the first Board of Directors Meeting of the year on February 24, 2026. The Board of Directors was presented with the 2025 Internal Audit Report, which had been reviewed and evaluated by KPMG, and acknowledged the evaluation report regarding COSO’s framework, which was evaluated by the Company’s internal audit department and has been reviewed by the Audit Committee.
Both the Board of Directors and the Audit Committee agreed that the Company's internal control was reasonable and appropriate for its business operations, based on the evaluation of the internal control system for the year 2025. The Company has also implemented the ISO 9001:2015 quality management system, which has improved the internal control system by promoting clarity, transparency, systematic work standards, and credibility/reliability. This implementation has also ensured that the Company's risk management is effective through ongoing risk management and corporate governance.
Auditor Has Observations on Internal Control
No
Opinion on the Head of Internal Audit
Head of Internal Audit
3159
Audit Committee's Opinion on the Head of Internal Audit
In 2025, the Board of Directors appointed KPMG, an external firm, as the Company's internal auditor. The Audit Committee conducted a screening process and selected Ms. Naipaporn Sagulyat, Partner of KPMG, to serve as the Company's internal auditor. She has independence and professional qualification, and has extensive experience in internal audit in similar firms and industries. The Audit Committee reviewed her qualifications and determined that she was fully qualified to perform the duties of the primary individual responsible for evaluating the Company's internal control system.
Additionally, the Company appointed Mr. Kobchok Sae-ung as the Company’s internal auditor to manage and oversee all work operations in accordance with internal control and risk management practices.
For further details, refer to the internal auditor's profile in Appendix 3.
Appointment, Discharge & Transfer of the Head of Internal Audit
Requires Audit Committee Approval
Yes
Related Party Transactions
Has Related Party Transactions
Yes
Counterparties & Transactions
Monetary Unit
1000000
Counterparties with Potential Conflicts
| Name | Person / Juristic Person | Type of Business | Nature of Relationship | As of Date (YYYY-MM-DD) |
|---|---|---|---|---|
| Phonesack Group Company Limited | Juristic Person | - | The juristic person connecting with the Company’s director | 2025-12-31T00:00 |
| Xekong Power Plant Company Limited (“XPPL”) | Juristic Person | - | The juristic person connecting with the Company’s director | 2025-12-31T00:00 |
| Xekong Thermal Power Plant Company Limited (“XTPPL”) | Juristic Person | - | The juristic person connecting with the Company’s director | 2025-12-31T00:00 |
| PSGC (Lao) Sole Company Limited (“PSGC Lao”) | Juristic Person | - | The Company’s subsidiary holding 100% stakes | 2025-12-31T00:00 |
| PT Sole Company Limited | Juristic Person | - | The juristic person connecting with the Company’s director | 2025-12-31T00:00 |
| KhamKeut-Saen Oudom Gold Mining Co.,Ltd (“KSO”) | Juristic Person | - | The juristic person connecting with the Company’s director | 2025-12-31T00:00 |
Transactions by Counterparty
| Transactions |
|---|
| 0.06 · Necessity: Expenditure on coordinating with agencies and institutions in Lao PDR, such as visa and work permit fees, which was operated by the project owner. · Description: - · As of yesteryear: 0.14 · Nature of transaction: Expenses on visa and work permit operations · Audit committee opinion: The Company paid to Phonesack Group Company Limited for the expenses regarding coordinating with agencies and institutions in Lao PDR such as visa and work permit fee, which was operated by the project owner, and it was normal business-support transaction. Its price was reasonable compared to the service fee charged by other service providers. · As of year before yesteryear: 0.14 · Expenditure on coordinating with agencies and institutions in Lao PDR, such as visa and work permit fees, which was operated by the project owner. · Description: - · Nature of transaction: Other payables · Audit committee opinion: The Company paid to Phonesack Group Company Limited for the expenses regarding coordinating with agencies and institutions in Lao PDR such as visa and work permit fee, which was operated by the project owner, and it was normal business-support transaction. Its price was reasonable compared to the service fee charged by other service providers. · As of year before yesteryear: 0.01 |
| 1309.07 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 2917.36 · Nature of transaction: Income per construction contract · Audit committee opinion: XPPL hired the Company to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 2597.67 · 1551.03 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 1277.73 · Nature of transaction: Accounts receivable · Audit committee opinion: XPPL hired the Company to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 603.15 · 296.82 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 911.15 · Nature of transaction: Unbilled receivables · Audit committee opinion: XPPL hired the Company to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 1108.89 · 148.55 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 129.98 · Nature of transaction: Retention receivables · Audit committee opinion: XPPL hired the Company to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 95.91 · 2.19 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 5.25 · Nature of transaction: Unearned payables · Audit committee opinion: XPPL hired the Company to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 79.52 · 0.54 · Necessity: Since Lao PDR has encountered the issue on domestic fuel supply and other fuel sources were far from the project site. To facilitate and provide service on public utility, the Company used XPPL’s service; and its price was reasonable, compared to the service fee charged by other providers. · Description: - · As of yesteryear: 0.78 · Nature of transaction: Fuel and public utility cost · Audit committee opinion: The Company’s construction team purchased fuel from XPPL for the operations of the project. The fuel price of XPPL was according to market price. In addional, the Company’s construction team purchased other utilities, i.e. water supply, cleaning services being charged according to the market price. · As of year before yesteryear: 0.79 · 0.77 · Necessity: To facilitate and provide service on public utility, the Company used XPPL’s service; and its price was reasonable, compared to the service fee charged by other providers. · Description: - · As of yesteryear: 0.28 · Nature of transaction: Other payables · Audit committee opinion: The Company’s construction team purchased fuel from XPPL for the operations of the project since Lao PDR has encountered the issue on domestic fuel supply and other fuel sources were far from the project site as well as the fuel price of XPPL was according to market price. In addition, the Company’s construction team purchased other utilities, i.e. water supply, cleaning services being charged according to the market price. · As of year before yesteryear: 0.19 · 38.39 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Interest · Audit committee opinion: XPPL hired the Company to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 0.0 · 853.52 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Non-current trade receivables · Audit committee opinion: XPPL hired the Company to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 0.0 · 0.31 · Necessity: To facilitate and provide service on consumer goods and other miscellaneous expenses, the Company used XPPL’s service; and its price was reasonable, compared to the service fee charged by other providers. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Other expenses · Audit committee opinion: The Company purchased consumer goods and other miscellaneous items for operational use. The prices charged were in accordance with market rates and comparable to those offered to general customers. · As of year before yesteryear: 0.0 · 25.85 · Necessity: XPPL hired the Company to undertake construction project per contract. · Description: - · As of yesteryear: 0.0 · Nature of transaction: other current receivables · Audit committee opinion: XPPL hired the Company to undertake construction project per contract. · As of year before yesteryear: 0.0 |
| 8.27 · Necessity: XTPPL hired the Company for working as an advisor. · Description: - · As of yesteryear: 8.44 · Nature of transaction: Other incomes · Audit committee opinion: XTPPL hired the Company for working as a Project Development Service and consult for their project. The price charged was under general commercial condition. · As of year before yesteryear: 2.06 · 9.28 · Necessity: XTPPL hired the Company for working as an advisor. · Description: - · As of yesteryear: 1.42 · Nature of transaction: Other receivables · Audit committee opinion: XTPPL hired the Company for working as a Project Development Service and consult for their project. The price charged was under general commercial condition. · As of year before yesteryear: 2.04 |
| 28.39 · Necessity: The Company hired PSGC Lao work as a sub-contractor and a project manager for the Resettlement project. · Description: - · As of yesteryear: 644.12 · Nature of transaction: Subcontractor cost · Audit committee opinion: PSGC (Lao) Sole Company Limited (“PSGC Lao”): The Company signed an agreement with PSGC Lao to undertake subcontracting by providing contractors to conduct the construction project and a project manager for the Resettlement project. The price charged was under general commercial condition. Furthermore, PSGC Lao facilitated the Company with vehicles support as the construction site was remote. The price for vehicles support was reasonable and was defined as ordinary business support transaction. · As of year before yesteryear: 738.07 · 0.65 · Necessity: PSGC Lao hired the Company for working as an advisor and the Company has facilitated the email domain system and program license fee to PSGC Lao. The price charged was under general commercial condition · Description: - · As of yesteryear: 0.2 · Nature of transaction: Other receivables · Audit committee opinion: PSGC Lao hired the Company for working as an advisor and the Company has facilitated the email domain system and program license fee to PSGC Lao. The price charged was under general commercial condition · As of year before yesteryear: 0.0 · 4.11 · Necessity: The Company hired PSGC Lao work as a sub-contractor and a project manager for the Resettlement project. · Description: - · As of yesteryear: 19.99 · Nature of transaction: Accounts payable · Audit committee opinion: PSGC (Lao) Sole Company Limited (“PSGC Lao”): The Company signed an agreement with PSGC Lao to undertake subcontracting by providing contractors to conduct the construction project and a project manager for the Resettlement project. The price charged was under general commercial condition. Furthermore, PSGC Lao facilitated the Company with vehicles support as the construction site was remote. The price for vehicles support was reasonable and was defined as ordinary business support transaction. · As of year before yesteryear: 243.79 · 7.58 · Necessity: The Company hired PSGC Lao work as a sub-contractor and a project manager for the Resettlement project. · Description: - · As of yesteryear: 3.3 · Nature of transaction: Other payables · Audit committee opinion: PSGC (Lao) Sole Company Limited (“PSGC Lao”): The Company signed an agreement with PSGC Lao to undertake subcontracting by providing contractors to conduct the construction project and a project manager for the Resettlement project. The price charged was under general commercial condition. Furthermore, PSGC Lao facilitated the Company with vehicles support as the construction site was remote. The price for vehicles support was reasonable and was defined as ordinary business support transaction. · As of year before yesteryear: 0.3 · 0.55 · Necessity: PSGC Lao hired the Company for working as an advisor. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Other income · Audit committee opinion: PSGC Lao hired the Company for working as an advisor for their project. The price charged was under general commercial condition. · As of year before yesteryear: 0.0 · 21.71 · Necessity: The Company hired PSGC Lao work as a sub-contractor for the Resettlement project. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Retention payables · Audit committee opinion: The Company signed an agreement with PSGC Lao to undertake subcontracting by providing contractors to conduct the construction project for the Resettlement project. The price charged was under general commercial condition. · As of year before yesteryear: 0.0 |
| 0.0 · Necessity: PSCG Lao has rented office space on the 6th floor from PT Sole Company Limited. The rental fee and public utility cost were the normal rate and its price was reasonable, compared to the service fee charged by other service providers. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Office rental fee and public utility cost · Audit committee opinion: PSGC Lao rented office space on the 6th floor from PT Sole with a reasonable rental fee and public utility cost compared to that of other landlords. · As of year before yesteryear: 0.21 · 0.07 · Necessity: PSCG Lao has rented office space on the 6th floor from PT Sole Company Limited. The rental fee and public utility cost were the normal rate and its price was reasonable, compared to the service fee charged by other service providers. · Description: - · As of yesteryear: 0.05 · Nature of transaction: Interest expenses · Audit committee opinion: PSGC Lao rented office space on the 6th floor from PT Sole with a reasonable rental fee and public utility cost compared to that of other landlords. · As of year before yesteryear: 0.05 · 1.95 · Necessity: PSCG Lao has rented office space on the 6th floor from PT Sole Company Limited. The rental fee and public utility cost were the normal rate and its price was reasonable, compared to the service fee charged by other service providers. · Description: - · As of yesteryear: 0.89 · Nature of transaction: Lease liabilities · Audit committee opinion: PSGC Lao rented office space on the 6th floor from PT Sole with a reasonable rental fee and public utility cost compared to that of other landlords. · As of year before yesteryear: 0.89 · 0.04 · Necessity: PSCG Lao has rented office space on the 6th floor from PT Sole Company Limited. The rental fee and public utility cost were the normal rate and its price was reasonable, compared to the service fee charged by other service providers. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Other expenses · Audit committee opinion: PSGC Lao rented office space on the 6th floor from PT Sole with a reasonable rental fee and public utility cost compared to that of other landlords. · As of year before yesteryear: 0.0 · 0.08 · Necessity: PSCG Lao has rented office space on the 6th floor from PT Sole Company Limited. The rental fee and public utility cost were the normal rate and its price was reasonable, compared to the service fee charged by other service providers. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Other current payables · Audit committee opinion: PSGC Lao rented office space on the 6th floor from PT Sole with a reasonable rental fee and public utility cost compared to that of other landlords. · As of year before yesteryear: 0.0 |
| 5.83 · Necessity: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Income per construction contract · Audit committee opinion: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 0.0 · 2.42 · Necessity: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Trade receivables · Audit committee opinion: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 0.0 · 0.19 · Necessity: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Retention receivables · Audit committee opinion: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 0.0 · 0.15 · Necessity: To facilitate and provide service on consumer goods and other miscellaneous expenses, PSGC Lao used KSO’s service; and its price was reasonable, compared to the service fee charged by other providers. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Other current payables · Audit committee opinion: PSGC Lao purchased consumer goods and other miscellaneous items for operational use. The prices charged were in accordance with market rates and comparable to those offered to general customers. · As of year before yesteryear: 0.0 · 0.3 · Necessity: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · Description: - · As of yesteryear: 0.0 · Nature of transaction: Unearned payables · Audit committee opinion: KSO hired PSGC Lao to conduct construction contracting project. The price charged per contract was under general commercial condition. · As of year before yesteryear: 0.0 |
Policy & Future Trends
Policy, Measures & Approval Process
In case the connected transactions of the Company and its subsidiary are made with juristic person or person who may lead to conflict of interest in the future, the Company sets the approval process of connected transaction as follows:
1. The Company will consider whether the connected transaction between the Company and/or its subsidiary and juristic person/person may lead to conflict of interest as defined by Securities and Exchange Commission (SEC).
2. In case it is related transaction, the Company will calculate value of related transaction and compare with net tangible assets (NTA) of the Company to calculate the transaction size as specified by SEC. SEC categorizes connected transaction into 5 types:
1) Normal business transaction
2) Normal business-support transaction
3) Transaction on offering short-term real estate rental
4) Transaction relating to products and services
5) Transaction on offering or receiving financial assistance.
3. In case the related transactions are normal business transaction and normal business-support transaction, the Board of Directors empowers the Management to consider the process and price. Such transaction must be under general commercial conditions which consist of fair price and do not lead to benefit transfer. The Management is required to perform the report of such transaction to present to Audit Committee and the Board of Directors for acknowledgement quarterly.
4. In case of other connected transactions in addition to the transaction mentioned above, the Company follows the measure and procedure of connected transaction approval for the sake of the Company highest benefit, similarly to arm’s length transaction to be transparent, no conflict of interest and offering highest benefit to the Company and shareholders. The Company measures the size of transaction and follows the instructions imposed by Securities and Exchange Commission, to present to Audit Committee for gaining opinion on the necessity and suitability of such transaction. In case the AC has no expertise on certain transactions, the Company will appoint independent expert/specialist or the Company’s auditor to provide opinion on such transaction for the BoD or shareholders’ making decision. The director who holds stake with such connected transaction is unable to approve or vote for the resolution on the relevant matter.
Future Trends in Related Party Transactions
The Company will consider undertaking only the connected transactions that are vital or categorized in business support. The price measurement follows criteria and guideline of general commercial price measurement. The Company abides by measure and process of connected transaction approval together with the opinion of Audit Committee on the necessity and suitability of the transaction in case the AC has no expertise on certain transactions, the Company will appoint independent expert/specialist or the Company’s auditor to provide opinion on such transaction for the BoD or shareholders’ making decision.
In addition, the Company has its policy to strictly comply with announcement, rules and regulations of the Stock Exchange of Thailand (SET) and Securities and Exchange Commission (SEC) as well as accounting standard by Thai Accountant Association and Certified Public Accountant. Moreover, the Company will disclose the description of connected transaction in note to financial statement reviewed and audited by the Company’s auditor, including in the Company’s Annual Report. The Company also has no policy to designate representative to conduct any non-transparent transactions on behalf of the Company.